Freight load planner

Turns cargo lines into truck-fleet plans, with a 3D load view and cost ranking against rate cards.

Key result

Globally optimal plans in 33–66 s

Year
2026
Role
Solo
Context
Bielcrystal

Recorded on a local copy with demo data.

How it works

  1. 01

    The Rust solver combines bin packing with large neighborhood search and returns a global optimum in 33 to 66 seconds.

  2. 02

    Plans are ranked by cost against versioned rate cards.

  3. 03

    A regression suite of 792 real shipments gates every change in CI.

  4. 04

    Deployed with Kamal and GitHub Actions to a solver host behind Cloudflare Tunnel.

Screens

Freight load planner, screenshot
Freight load planner, screenshot